Estimate removal worker-hours, crew shifts, and labor cost in USD. Enter contractor-validated production rates for each material and site condition; no national productivity or wage rate is assumed. Quantity and production rate must use the same unit. Enter 0 for unused allowances or activities. Scope quantities must be nonnegative, rates greater than 0, and difficulty multipliers at least 1; the invalid-row result must be 0. Setup, cleanup and other inputs are TOTAL worker-hours, not elapsed crew hours. Avoid double counting breaks/decontamination already included in production rates. Dedicated supervisors are additional to the removal crew and budgeted for rounded full shifts; enter their fully loaded rate including any overtime. Worker overtime percentage is a budgeting input, not a payroll compliance determination. Crew shifts exclude waiting for clearance, mobilization gaps and other calendar delays. Labor only: excludes disposal, equipment, materials, testing, permits, travel, lodging, overhead and profit unless explicitly included in entered labor costs. Planning estimate; validate against site survey, work plan, applicable wage requirements and actual production history.
This form asks: